一般情況只是對(duì)管子的根部或者屋面部分山東防水材料的施工,進(jìn)行抽樣澆水處理,抽取的數(shù)量要超出屋面泛水的三分之一,澆水的時(shí)間建議不要少于一個(gè)小時(shí),如果沒(méi)有滲漏就算合格。但是若出現(xiàn)滲漏情況,就要抽取雙倍的數(shù)量進(jìn)行試驗(yàn),若還是有滲漏的情況,就應(yīng)該全部澆水進(jìn)行試驗(yàn)。
A級(jí)防火保溫材料
The general situation of the construction is the root or part of Shandong roofing waterproof materials, sampling watering treatment, extraction quantity to exceed the roof flashing 1/3, watering time not less than one hour, if there is no leakage even qualified. However, if there is leakage, it is necessary to extract the number of double test, if there is leakage, it should be all water for testing.
一般墻面山東防水材料處理的高度建議不低于20cm,*下端需要用細(xì)石混凝土做墻墊,墻墊的高度不能小于100mm,這是對(duì)于墻面防水的*基礎(chǔ)要求。對(duì)于墻體防水的驗(yàn)收,建議采取淋水試驗(yàn),在3到4分鐘不間斷的噴淋中,如果墻面不出現(xiàn)滲透現(xiàn)象就算合格。
General wall of Shandong waterproof material treatment is highly recommended not less than 20cm, the lower end of the need to use fine stone concrete wall pad, the height of the wall mat can not be less than 100mm, which is the most basic requirements for wall waterproofing. For the acceptance of the wall, it is recommended to take the water test, in 3 to 4 minutes of continuous spray, if the wall does not appear even if the penetration phenomenon.
一般在衛(wèi)生間的山東防水材料施工完畢后,先將衛(wèi)生間的下水口堵死,然后在門(mén)口位置壘一個(gè)15cm高的坎,*后再在衛(wèi)生間灌入15cm左右的水。驗(yàn)收時(shí)間 是在24個(gè)小時(shí)之后,這個(gè)時(shí)候再去檢查四周墻面以及地面是否出現(xiàn)滲漏現(xiàn)象,時(shí)間一定要把握好,這是保證衛(wèi)生間山東防水材料施工能否有效的關(guān)鍵之處。
General in the bathroom after Shandong construction of waterproof material, the sewer blocked the toilet, and then at the gate location to base a 15cm high ridge, then poured into the toilet in the water 15cm. Acceptance time is after 24 hours, this time to check the surrounding walls and whether the ground leakage phenomenon, must grasp the time |
 |
|